Job report
Harbour Trade Co.
Power point installation
- Completed
- 12 September 2026
- Customer
- Sam Nguyen
- Job address
- 8 Sample Road, Parramatta NSW
Installed a new double power point in the living room and confirmed it was working.
Work completed
Ran a new circuit from the existing board position as agreed, fitted a double power point on the living room wall and secured all connections. Powered up and checked the outlet with a plug-in tester.
Findings
Existing board had spare capacity for the additional outlet. Wall cavity was clear at the agreed location. No damage to surrounding finishes beyond the cut-out.
Materials
- Double power point
- Cable and fixings as required
- Not specified — add brands only if recorded
Result
Outlet powered and tested. Area left clean.
Recommendations
- Do not overload the new outlet with high-draw appliances on the same circuit
- Call back if the outlet trips or feels warm in use
Technician notes
Customer preferred the outlet 400 mm above the skirting, left of the TV unit.