Job report
Harbour Trade Co.
Bathroom renovation — tiling stage
- Completed
- 14 September 2026
- Customer
- Morgan Ellis
- Job address
- 7 Hillcrest Drive, Hobart TAS
Completed wall and floor tiling for the main bathroom as per the agreed layout.
Work completed
Set out tiles to the agreed pattern, laid floor and wall tiles in the wet areas, grouted and cleaned down. Protected adjoining rooms during the work and removed packaging from site.
Findings
Substrate was sound and within tolerance after the previous prep visit. No movement joints required beyond those shown on the plan.
Materials
- Ceramic wall and floor tiles as supplied by customer
- Adhesive and grout as specified on the job sheet
- Not specified — add product names only if recorded
Result
Tiling complete and curing. Ready for the next trade as scheduled.
Recommendations
- Allow full cure before heavy use of the space
- Keep a copy of this record with renovation documents